 The first testing of UniGEN in the year 2008 |  The first installation of several UniGENs with complete set of UniGEN-SpeedCON-TMCI2 in Latvia. Gensets have now exceeded a total of 80,000 machine hours of defect-free operation. |
 The first installation of UniGEN with 17 inch touch-screen display for comfort visualization and controll |  Installation of sets of UniGEN-UIS-USC with wood gas engines |
 UniGENs with common touch-screen visualisation on 250kW landfill gas engines |  8 cylinder V-type landfill engine |
 UniGENs control the CHP units powered by methane gas from the thermal water |  Overhaul of electronic control units for engines Jenbacher JMS156 |
 UniGEN equipped with special firmware to communicate with the TEM control system on biogas station |  50kW CHP powered by sawage gas from waste water treatment plan |
 Yet highest unit power (800kW) controlled by UniGEN. Using special software and is possible to connect using TemView software via internet interface of UniGEN to TEM (TEM monitor and configure as well as the local connection) |  Container design of 200kW biogas unit. With UniGEN controller, USC, and UIS2 UVR is possible not only to remote access control system, but also to the speed controller, voltage regulator and ignition. |
|